Free Training: Construction Schedule Risk Mitigation Strategies
Key Requirements for USACE Schedules
Schedule Constructability Review Techniques
6 Steps to Review a Time Impact Analysis (TIA)
How to Analyze Schedule Risk without Fancy Software
Other trainings or workshops customized to your needs
Delivered In-person or remote
For individuals, teams, or entire offices
Beginner to advanced levels
Our training services provide direct, practical instruction for individuals or teams at all skill levels. You'll be equipped with tools for immediate use of your new knowledge.
Courses and Workshops Include:
Beginner to advanced levels
For individuals, teams, or entire offices
Delivered In-person or remote (with the option of recorded lessons)
Courses and Workshops Include:
Our training services provide direct, practical instruction for individuals or teams at all skill levels. You'll be equipped with tools for immediate use of your new knowledge.
We offer trainings that are:
Primavera P6 Quick Start for Beginners
Key Requirements for USACE Schedules
Schedule Constructability Review Techniques
6 Steps to Review a Time Impact Analysis (TIA)
How to Analyze Schedule Risk without Fancy Software
Other trainings or workshops customized to your needs
Contractor Training Attendee
“What I learned from this training was enough to get started right away.
Contractor Training Attendee
'[CPM-SS] training courses have been (and will continue to be) a great resource for our team as we navigate the requirements for our USACE projects.'
Federal Training Attendee
“We were all very impressed by and appreciative of how relevant this training was for our current needs.
Government Training Attendee
“The training was well targeted, relevant, and concise given the breadth and depth.
I’ve had multiple conversations with several folks who agree and are excited to improve their ability to manage project schedules.”
Government Training Attendee
“This training is different from other schedule trainings because of how specialized it is for government construction projects.
This training is tactical, actionable, and I would recommend it to anyone working with MILCON schedules.”
Contractor Training Attendee
'They [CPM-SS] have provided clear and applicable training modules for us to quickly understand and reference while setting up and analyzing our project schedules.'
“What I learned from this training was enough to get started right away.
“We were all very impressed by and appreciative of how relevant this training was for our current needs.
Exactly what we were looking for!”
– Government Training Attendee
'[CPM-SS] training courses have been (and will continue to be) a great resource for our team as we navigate the requirements for our USACE projects.
They have provided clear and applicable training modules for us to quickly understand and reference while setting up and analyzing our project schedules.'
– Contractor Training Attendee
“The training was well targeted, relevant, and concise given the breadth and depth.
I’ve had multiple conversations with several folks who agree and are excited to improve their ability to manage project schedules.”
– Government Training Attendee
Access NAVFAC P6 schedule templates instantly for $150.
Access USACE P6 schedule templates instantly for $150.
Access narrative templates instantly for $50.
Use our tools to achieve quality and compliance with ease, set your project up for success, and save valuable time!
Use our tools to achieve quality and compliance with ease, set your project up for success, and save valuable time!
Starting with a new software can be quite intimidating, and Primavera P6 is no exception, especially if you're a newcomer. Traditional training methods can involve lengthy sessions, travel, and...
How to Learn Primavera P6 Quickly: A Beginner's Guide
Successful alignment of the project schedule and quality control system ensures a smooth start of the first phase of the 3 Phase Quality Control system. Also, it enables accurate monitoring of...
USACE Series Part 2:
Schedule and Quality Control
USACE Series Part 1:
Schedule and Progress Payments
The Schedule of Values and Construction Schedule are combined into a single Cost-Loaded Project Schedule, used to determine progress payments and provide placement projections...
Free Checklist
As the government or contractor, quickly and easily confirm your USACE schedule’s cost loading compliance with the 01 32 01.00 10 scheduling specifications.
Navigation
Legal
Offices located in West Granby, CT, and Forest Hill, MD
CPM Schedule Solutions LLC provides schedule consulting and training with a focus on military construction.
Copyright 2024 CPM Schedule Solutions LLC. All Rights Reserved.
Contact Us
Understand the what, why, and how behind the unique scheduling requirements for military and federal construction so you can successfully:
IN JUST 2 DAYS
Execute as the contractor, or
Review as the government
These P6 schedule template files incorporate key requirements from the standard UFGS 01 32 01.00 10 scheduling specification (updated as of 2023).
Included is a template for each example project:
Each narrative includes a detailed table of contents, example snapshots, and guided topics throughout.
Download instantly for $97.
01 32 01.00 10
01 32 16.00 20
01 32 17.00 20
This bundle includes 3 schedule narrative template files, all editable as word documents.
Professionally designed and formatted, there is a dedicate template to meet the requirements for each standard UFGS scheduling specification (updated as of 2023):
Each template includes:
A fully developed WBS, example milestones, task-dependent activities, logic, mandatory tasks, calendars through 2030, activity coding structure for SDEF, example cost loading and CLIN balancing, and more.
Download instantly for $297
Coming soon!
Use our tools to achieve quality and compliance with ease, set your project up for success, and save valuable time!
Download USACE P6 Schedule Template Files instantly for $150.
Set your USACE project up for success with our P6 schedule file templates that are formatted specifically for USACE schedule requirements.
Your purchase includes two Primavera P6 schedule templates, each tailored for an example USACE project:
Each narrative includes a detailed table of contents, example snapshots, and guided topics throughout.
Download all 3 templates instantly for $50.
01 32 01.00 10
01 32 16.00 20
01 32 17.00 20
This bundle includes 3 schedule narrative template files, all editable as word documents.
Professionally designed and formatted, there is a dedicate template to meet the requirements for each standard UFGS scheduling specification (updated as of 2023):
Free Cheat Sheet
Learn the 5 steps to link the schedule to the submittal register in RMS for USACE projects to improve visibility and minimize the risk of delays due to late or overlooked submittals.
Published June 2021, Updated April 2023
Receive practical, actionable training and tools, including specialized templates and instruction for military and federal construction projects.
Have any questions?
We'd love to hear from you.
Get started for free with our collection of resources and in-depth articles on scheduling to enhance your success.
Feel confident in your project schedule by ensuring it’s reliable, contractually compliant, and utilized as a tool to minimize risk.
Whenever you’re ready, there are 3 ways we can help:
This blog is for general informational purposes only and is not to be considered an official interpretation or enforcement policy of the UFGS standard specifications. As individual project requirements vary, refer to your specific contract. See our Terms and Conditions and Disclaimer for additional information.