Save time, energy, and money with our meticulously designed and instantly downloadable construction schedule narrative templates, available to you at an unbeatable price of $50.
Maintain Consistency: Ensure uniformity to enhance your brand’s professionalism and reliability.
Enhanced Presentation: Deliver consistently sleek and coherent project narratives every time.
Accelerate Your Workflow:
No need to build from the ground up – just add your project details.
While tailored to federal standards, these templates are seamlessly adaptable for private-sector projects alike.
U.S. Army Corps of Engineers (USACE)
Naval Facilities Engineering System Command (NAVFAC)
Air Force Civil Engineer Center (AFCEC)
National Aeronautics and Space Administration (NASA)
and other federal agencies
The 3 templates in this package were created to align with the guide scheduling specifications of the United Facilities Guide Specifications (UFGS), applicable to federal projects used by:
Achieve quality and compliance in your construction schedule narratives while saving valuable time!
Based on the UFGS 01 32 17.00 20 scheduling specifications, which has specific cost-loading and network analysis schedule (NAS) requirements.
Based on the UFGS 01 32 16.00 20 scheduling specifications, which is geared towards mid to small scale projects with lower complexity, such as few subcontractors or features of work.
Based on the UFGS 01 32 01.00 10 scheduling specifications, geared towards mid to large scale projects with a level of complexity, such as multiple subcontractors or features of work.
Achieve quality and compliance in your construction schedule narratives while saving valuable time!
Based on the UFGS 01 32 17.00 20 scheduling specification, geared towards specific cost-loading and network analysis schedule requirements.
Based on the UFGS 01 32 16.00 20 scheduling specification, geared towards smaller and less complex construction projects.
Based on the UFGS 01 32 01.00 10 scheduling specification, geared towards mid and large size projects with any level of complexity, such as multiple features of work.
This package offers three expertly crafted, fully customizable Word document templates customized for each of the UFGS scheduling specifications (01 32 01.00 10 updated Feb-15, 01 32 16.00 20 updated Aug-18, 01 32 17.00 20 updated May-18).
Save time and effort with these templates which allow you to input your project details without starting from scratch. Each template includes a comprehensive table of contents, example snapshots, and guided topics, facilitating clear communication of crucial information to stakeholders.
Though designed for government projects, our versatile templates are suitable for private-sector projects as well, ensuring coverage for any project type.
Each template includes:
A fully developed WBS, example milestones, task-dependent activities, logic, mandatory tasks, calendars through 2030, activity coding structure for SDEF, example cost loading and CLIN balancing, and more.
Download instantly for $297
These P6 schedule template files incorporate key requirements from the standard UFGS 01 32 01.00 10 scheduling specification (updated as of 2023).
Included is a template for each example project:
Each narrative includes a detailed table of contents, example snapshots, and guided topics throughout.
Download instantly for $97.
01 32 01.00 10
01 32 16.00 20
01 32 17.00 20
This bundle includes 3 schedule narrative template files, all editable as word documents.
Professionally designed and formatted, there is a dedicate template to meet the requirements for each standard UFGS scheduling specification (updated as of 2023):
Starting with a new software can be quite intimidating, and Primavera P6 is no exception, especially if you're a newcomer. Traditional training methods can involve lengthy sessions, travel, and...
How to Learn Primavera P6 Quickly: A Beginner's Guide
Successful alignment of the project schedule and quality control system ensures a smooth start of the first phase of the 3 Phase Quality Control system. Also, it enables accurate monitoring of...
USACE Series Part 2:
Schedule and Quality Control
USACE Series Part 1:
Schedule and Progress Payments
The Schedule of Values and Construction Schedule are combined into a single Cost-Loaded Project Schedule, used to determine progress payments and provide placement projections...
Free Checklist
As the government or contractor, quickly and easily confirm your USACE schedule’s cost loading compliance with the 01 32 01.00 10 scheduling specifications.
Free Cheat Sheet
Learn the 5 steps to link the schedule to the submittal register in RMS for USACE projects to improve visibility and minimize the risk of delays due to late or overlooked submittals.
Navigation
Legal
Offices located in West Granby, CT, and Forest Hill, MD
CPM Schedule Solutions LLC provides schedule consulting and training with a focus on military construction.
Copyright 2024 CPM Schedule Solutions LLC. All Rights Reserved.
Contact Us
Published June 2021, Updated April 2023
Receive practical, actionable training and tools, including specialized templates and instruction for military and federal construction projects.
Have any questions?
We'd love to hear from you.
Get started for free with our collection of resources and in-depth articles on scheduling to enhance your success.
Feel confident in your project schedule by ensuring it’s reliable, contractually compliant, and utilized as a tool to minimize risk.
Whenever you’re ready, there are 3 ways we can help:
This blog is for general informational purposes only and is not to be considered an official interpretation or enforcement policy of the UFGS standard specifications. As individual project requirements vary, refer to your specific contract. See our Terms and Conditions and Disclaimer for additional information.