Free Training: Construction Schedule Risk Mitigation Strategies
Published June 2021, Updated April 2023
Published April 2024
Example P6 Import Error Message
Example P6 Folder Structure (Enterprise Project Structure or EPS)
Learning how to import schedule files and troubleshoot any errors that may arise during the process is crucial–sometimes, these issues stem from compatibility problems with files from newer versions of the software.
First things first, understand the basic layout of Primavera P6. Start by creating a logical folder and subfolder structure, which is essential for importing schedule files. This organization mimics the familiar file system on your computer, helping you keep track of your projects.
Example Primavera P6 Work Breakdown Structure (WBS)
Example Primavera P6 Interface
Explore and customize the interface to suit your needs, adjusting visibility and access to various tools and buttons to streamline your workflow. Also, familiarize yourself with the work breakdown structure (WBS) of a schedule to review the sections within the project more effectively.
Primavera P6 has a detailed interface that might seem overwhelming at first. Take your time to explore the activity table, Gantt chart, and area to see predecessors and successors. (On the top pull-down menu in P6, click in 'View', then 'Show on Top' or 'Show on Bottom').
Primavera P6 Layouts
Primavera P6 Filters
Layouts enable you to save and recall your interface settings, including filters and column arrangements, making it easy to switch between different views. This functionality not only enhances flexibility but also improves efficiency by reducing setup time for repeated tasks.
Effective use of P6 involves mastering filters and layouts to view and manage specific activities within your projects. Filters allow you to display only the relevant activities, simplifying the review and analysis of schedules.
P6 Float Path Example
Primavera P6 Float Path Calculation
P6 Critical Path Example
Practice setting up and calculating the schedule to determine the critical path and experiment with settings to define what constitutes a critical activity based on your project schedule review specific needs.
Understanding and utilizing the critical path and top float paths functions in Primavera P6 is powerful for risk management in your projects. These features help you identify and prioritize potential risks by identifying the most critical tasks that could impact your project timeline.
If you're looking for structured learning, consider enrolling in a specialized training course. For example, our Primavera P6 Quick Start for Beginners workshop is specifically designed for those new to P6. In just two hours, you'll be:
Receive practical, actionable training and tools, including specialized templates and instruction for military and federal construction projects.
Have any questions?
We'd love to hear from you.
Get started for free with our collection of resources and in-depth articles on scheduling to enhance your success.
Feel confident in your project schedule by ensuring it’s reliable, contractually compliant, and utilized as a tool to minimize risk.
Whenever you’re ready, there are 3 ways we can help:
This blog is for general informational purposes only and is not to be considered an official interpretation or enforcement policy of the UFGS standard specifications. As individual project requirements vary, refer to your specific contract. See our Terms and Conditions and Disclaimer for additional information.
This blog is for general informational purposes only and is not to be considered an official interpretation or enforcement policy of the UFGS standard specifications. As individual project requirements vary, refer to your specific contract. See our Terms and Conditions and Disclaimer for additional information.
Whenever you’re ready, there are 3 ways we can help you:
1. Blog + Free Resources. Level up your military and federal construction scheduling expertise with our free resources and in-depth scheduling articles.
2. Consulting. Reduce schedule uncertainty by making sure your schedules are accurate, proactively identifying risks, and reducing your exposure for cost and time impacts.
3. Training + Tools. Quickly understand military and federal scheduling requirements with actionable tools so you can hit the ground running.
Starting with a new software can be quite intimidating, and Primavera P6 is no exception, especially if you're a newcomer. Traditional training methods can involve lengthy sessions, travel, and...
How to Learn Primavera P6 Quickly: A Beginner's Guide
Successful alignment of the project schedule and quality control system ensures a smooth start of the first phase of the 3 Phase Quality Control system. Also, it enables accurate monitoring of...
USACE Series Part 2:
Schedule and Quality Control
USACE Series Part 1:
Schedule and Progress Payments
The Schedule of Values and Construction Schedule are combined into a single Cost-Loaded Project Schedule, used to determine progress payments and provide placement projections...
Free Checklist
As the government or contractor, quickly and easily confirm your USACE schedule’s cost loading compliance with the 01 32 01.00 10 scheduling specifications.
Free Cheat Sheet
Learn the 5 steps to link the schedule to the submittal register in RMS for USACE projects to improve visibility and minimize the risk of delays due to late or overlooked submittals.
Navigation
Legal
Offices located in West Granby, CT, and Forest Hill, MD
CPM Schedule Solutions LLC provides schedule consulting and training with a focus on military construction.
Copyright 2024 CPM Schedule Solutions LLC. All Rights Reserved.
Contact Us